IBM C4040-226 시험 개요:
| 인증 벤더: | IBM |
| 시험명: | IBM POWER7 기반 파워 시스템 및 IBM i 기술 영업 역량 - v2 |
| 시험 번호: | C4040-226 |
| 시험 형식: | 객관식, 시나리오 기반 문제 |
| 지원 언어: | English |
| 관련 자격증: | IBM 파워 시스템 기술 영업 IBM i 영업 역량 |
| 샘플 문제: | IBM C4040-226 샘플 문제 |
| 전제 조건: | 엄격한 선수 자격 요건은 없으나, IBM 파워 시스템 및 기업 IT 인프라에 대한 기본 지식이 있으면 도움이 됩니다. |
IBM C4040-226 시험 요강 주제:
| 섹션 | 목표 |
|---|---|
| 주제 1: IBM 파워 시스템 솔루션 영업 | - 고객 요구사항 분석
|
| 주제 2: IBM i 운영 체제 | - IBM i 워크로드 및 활용 사례
|
| 주제 3: 경쟁 환경 및 포지셔닝 역량 | - IBM 차별화 전략
|
| 주제 4: IBM 파워 시스템 개요 | - IBM 파워 시스템 제품군 포지셔닝
|
최신 IBM Certified Sales Expert C4040-226 무료샘플문제
1. Which of the following describes Single Level Storage?
A) Disk space and system memory is viewed as one large storage area.
B) Disk cache and system memory is viewed as one large storage area.
C) Disk space and system memory is viewed as cache.
D) Disk space and SAS adapter cache is viewed as one large storage area.
2. An IBM i 7.1 customer with a Power 720 needs to occasionally run a small test environment of IBM i. The environment doesn't require regular backups, availability isn't a factor, and consistent I/O performance isn't important.
The test environment needs to be deployed quickly, and must be redeployed with a fresh instance after testing.
Which of these following configurations supports these requirements?
A) Storage managed with VIO Server, dedicated network
B) Dedicated internal storage and network
C) Storage and network managed with VIO Server
D) IBM i as a client partition of IBM i
3. What part of PowerHA for i can ensure that objects such as device descriptions and user profiles in *SYSBAS are consistent on all machines participating in the cluster?
A) Loop-level device domains
B) Administrative domains
C) Independent ASP (iASP) redirect
D) Tower-level clustering
4. A customer is migrating from POWERS 520 to a POWER7 720. The migration includes the transfer of IBM i Licensed Program Products, and both systems need to run in parallel production for 30 days.
Which action supports this requirement?
A) Use temporary CBU keys during the migration period
B) Include IBM Temporary Software License for i product in the configuration
C) Request temporary migration keys
D) On/Off Capacity on Demand Licensing
5. A customer is migrating their database application from a system with significantly less I/O and processing performance to a new POWER7+ machine.
What can be suggested to significantly decrease the amount of time taken to save the source system prior to the migration?
A) Permanently apply all non-IBM PTFs.
B) IPL the system in to restricted state.
C) Use ASP balancing functions to stop allocation and remove some disks prior to the save.
D) Change the system value for "1=Save Access Paths" to "0=Do not save".
질문과 대답:
| 질문 # 1 정답: A | 질문 # 2 정답: D | 질문 # 3 정답: B | 질문 # 4 정답: B | 질문 # 5 정답: D |














1040 개 고객 리뷰
품질과 가치ITCertKR 의 높은 정확도를 보장하는 최고품질의 덤프는 IT인증시험에 대비하여 제작된것으로서 높은 적중율을 자랑하고 있습니다.
테스트 및 승인ITCertKR 의 덤프는 모두 엘리트한 전문가들이 실제시험문제를 분석하여 답을 작성한 만큼 시험문제의 적중률은 아주 높습니다.
쉽게 시험패스ITCertKR의 테스트 엔진을 사용하여 시험을 준비한다는것은 첫 번째 시도에서 인증시험 패스성공을 의미합니다.
주문하기전 체험ITCertKR의 각 제품은 무료 데모를 제공합니다. 구입하기로 결정하기 전에 덤프샘플문제로 덤프품질과 실용성을 검증할수 있습니다.
